Construction tool charger / industrial power adapter
Power Tool Chargers for Construction & Contractors
- Built for harsh jobsite conditions
- Stable charging under heavy load
- Reliable supply for project-based orders
Construction Professionals’ Real Challenges
What Contractors Really Care About
- The construction site environment is harsh (high temperature, dust, humidity)
- Continuous use of tools, charging interruptions affect progress
- The charger is frequently damaged, resulting in high maintenance costs
- The project cycle is fixed, and stockouts pose a risk
Products for Construction Applications
Power Solutions for Construction Applications, Specially designed for high-load and high-frequency use
24V / 36V Tool Chargers
48V High-power Chargers
Industrial-grade Power Adapters
Long-cable adapters for jobsite flexibility
Designed for Continuous Jobsite Operation
Jobsite-Ready Charger & Adapter Design
High-load Stable Charging
·Supports continuous high-power output
·Voltage and current are stable
·Suitable for multi-shift construction scenarios
Thermal & Environmental Protection
·Enhanced heat dissipation design
·Automatic current reduction protection at high temperatures
·Heat-resistant and impact-resistant shell material
Multi-level Safety Protection
·Overvoltage / Overcurrent / Overtemperature / Short circuit protection
·Prevent risks arising from power fluctuations on construction sites
Project & Bulk Supply Support
Project-based Supply & Support
Bulk supply guarantee
·Project-level supply plan
·Consistency within stable batches
·Long-term models are not subject to arbitrary changes
Project cycle coordination
·Deliver according to construction nodes
·Emergency replenishment support
·Collaboration on project material list
Technical Coordination
·Quick confirmation of technical parameters
·On-site application matching suggestions
Construction & Contractor Case Studies
Commercial Construction Contractor (USA)
Project Challenges:
- The high temperature at the construction site caused the charger to overheat
- Disruption of continuous operations affects the construction timeline
Solution:
- Special charging solution for high-temperature environments
- Enhanced heat dissipation and current limiting protection
Achievement:
- The availability rate of tools has been significantly improved
- The construction progress is stable
- The damage rate of chargers has decreased
Infrastructure Project Contractor (APAC)
Project Challenges:
- Long project cycle
- Centralized procurement of equipment demands high consistency
Solution:
- Project-level bulk supply
- Long-term locking of parameters and models
Achievement:
- The project is progressing smoothly
- Procurement and maintenance costs are controllable
Built for Global Construction Markets
·US / EU / UK / AU plug standards
·100–240V wide input
·Suitable for North America, Europe, Middle East, APAC